How to add Technologies Base file
Technologies
This Base File is used to register standardized codes for different technologies that will be used in the performance of mainly On-Condition Maintenance tasks. This also helps in the determination of resources required for acquisition, planning and scheduling in the user’s Work Management System.
Adding new Technologies
- Select the Technologies tab.
- Click the "Add" button.
- Capture the "Type".
- Capture the "Description".
- Click "Save".
Editing and Deleting existing Technologies
- Select a technology record that you wish to update from the grid. The selected row will be highlighted in grey to indicate its selection.
- Click the "Edit" or "Delete" button.
- If "Delete" is selected, a pop-up window will appear requesting the user to confirm the deletion. Click delete to continue and the record will be removed from the grid. If this action was a mistake, then click cancel.
- If the "Edit" button is selected, update the Technology details.
- Click "Save".
Related Articles
How to add a Manufacturer Base file in AMD
Manufacturer This base file is used to register standardized manufacturers. Adding new manufacturers Select base files from the AMD index page. Select the Manufacturer tab. Select the Add button. Capture the Manufacturer Name. Capture the Contact ...
How to add the Operational Status Base file in AMD
Operational Status This base file is used to register standardized operational Statuses. Adding a new Operational Status Select Base files in AMD module on the index page. Select the Operational Status tab. Click the Add button. Capture the ...
How to add an RCM Failure Mode Base File
Failure Mode RCM Type is used to distinguish between an RCM2™ and RCM3™ "Failure Mode". RCM3™ Failure Modes Explained Failure Mode is a term used to describe any event which causes a functional failure. A failure mode is the combination of a cause, ...
How to add RCM Indicator Units of Measure Base file
Indicator Units of Measure (UOM) This Base File is used to register standardized Units of Measure (UOM) for maintenance task scheduling. These only apply to cumulative or Numeric Indicators. Adding new Indicator Units of Measure: Select the ...
How to add RCM Potential Failure Condition Base file
Potential Failure Condition A Potential Failure Condition is an identifiable condition that indicates that a functional failure is either about to occur or in the process of occurring. This Base File is used to register Potential Failure Condition. ...